In R12, you can launch three type of plans:
And for MRP Planning Item, you should run Manufacturing plan.
Please see the explanation from Dev in similar question from other customers in Oracle Technical forum:
"The below are the 3 plan types :
1. MPP (Master Plan)
2. MPS (Production Plan)
3. MRP (Manufacturing Plan)
A. In 11.5.9, we had three plan types: DRP (Distribution Plan), MPS (Production Plan) and MRP (Manufacturing Plan)
B. In 11.5.10, we had three plan types: MPP, MPS and MRP. We changed the DRP name to MPP.
Why? Because in R12, we introduced a new Distribution Planning engine and having the term DRP used for the old plan type would have caused more confusion than MPP."
- Production Plan
- Manufacturing Plan
- Master Plan
And for MRP Planning Item, you should run Manufacturing plan.
Please see the explanation from Dev in similar question from other customers in Oracle Technical forum:
"The below are the 3 plan types :
1. MPP (Master Plan)
2. MPS (Production Plan)
3. MRP (Manufacturing Plan)
A. In 11.5.9, we had three plan types: DRP (Distribution Plan), MPS (Production Plan) and MRP (Manufacturing Plan)
B. In 11.5.10, we had three plan types: MPP, MPS and MRP. We changed the DRP name to MPP.
Why? Because in R12, we introduced a new Distribution Planning engine and having the term DRP used for the old plan type would have caused more confusion than MPP."